Documents
-
26th Ward WWTP Bypass
The estimated flow through this regulator was 85 MGD, with a combined plant capacity of 170 MGD. Local environmental regulations restricted the use of diesel engines to 175 HP or less, and all engine driven equipment was required to be sound attenuated to 50 decibels at 30 feet.
-
-
-
-
-
-
-
Sewage and stormwater pump stations
The revival of one of Britain’s largest commercially unexploited land areas called for multi-phase construction of two large pump stations.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-