Documents
-
-
Emergency sewer system repair
40-year-old carbon steel pipe with catastrophic failure repaired in hazardous wet well conditions. Smith-Blair 675 restored system integrity with zero downtime. -
Empowering Aquaculture with Optimized Performance
For aquaculture producers, working with a trusted partner can help them avail of global expertise alongside regional and local knowledge built over decades of working with fish farmers, original equipment manufacturers (OEMs), integrators, well boat manufacturers, and processing plants.
-
Engineering a more efficient way to source and transfer water
One of the largest global energy exploration companies faced the challenge of drawing source water among the steep slopes of Northern Pennsylvania. The water had to be drawn from a 30-feet deep wet well beside a creek and then pumped 300-feet vertically out of a ravine into the impoundment pond.
-
-
EnviroMix BioMix delivers environmental benefits for NH plant
Read how the Town of Exeter used EnviroMix BioMix™ technology to improve nitrogen removal, reduce energy consumption, and protect the Squamscott River. -
EnviroMix BioMix upgrade slashes O&M costs for NH facility
Read how the Nashua Wastewater Treatment Facility used EnviroMix BioMix technology to cut energy consumption by more than 80% and simplify sludge mixing operations. -
-
-
-
-
-
-
-
-
Evoqua Solution Resolves Stormwater Discharge Permit Violations
A Southern California refinery resolved stormwater discharge permit violations in five days using Xylem’s vessel-based treatment system with organoclay, carbon, and ion exchange to remove hydrocarbons and metals to ppb levels.
-
Fire Codes: A Foundation of Safety for a Rapidly Changing World
As rapid urbanization around the globe continues to spur construction of high-rise residential and commercial structures, hospitals, schools and other buildings — an expected 2.4 billion more people will live in urban areas by 2050 with over 90 percent of them in Africa and Asia — applying the strictest safety measures for fire protection is paramount to safeguarding life and property.
-
-
Flower Mound, Texas Prioritizes Repairs, Prevents Failures, and Reduces Risk with Engineering Assessment
The assessment was urgent, as Flower Mound planned to widen a major road next to the main and wanted reliable information on the condition of that particular pipeline before the road was built. Any necessary repairs or replacement needed to be completed prior to construction to avoid significant disruption and additional expense.
-
-
-
-
-